Skip links

Archive

C.E. Middle School

C.E. Middle School

Location: West Ashley, South Carolina Size: 40 acres Description: The middle school is replacing the existing CE Middle School and is designed for 900 students. The site is approximately 40 acres and will include two new sports fields. The school’s pedestrian connectivity throughout the West Ashley Campus provides access to the school from neighborhoods in [...]
Clemson University Renovation Feasibility Study

Clemson University Renovation Feasibility Study

Location: Clemson, South Carolina Description: ADC worked with Clemson University Facilities, Parking Services and Athletic departments to master plan improvements to the existing parking lots adjacent to Memorial Stadium. The goal of the project was to increase available parking, increase open space that could be used by students and football fans and improve vehicular and [...]
Piedmont Technical College Upstate Center for Manufacturing Excellence

Piedmont Technical College Upstate Center for Manufacturing Excellence

Location: Greenwood, South Carolina Size: 42,000 SF Cost: $12,000,000 Description: The manufacturing training facility at the Piedmont Technical College Greenwood campus includes laboratories and classrooms to provide technology-based workforce training. Services Bidding and Negotiation CoordinationCampus PlanningCivil EngineeringConstruction Administration and ObservationConstruction Document PreparationCost Estimating and ControlLandscape ArchitecturePermitting and Mitigation PlansSanitary SewerStorm Water Pretreatment Devices
Von Braun III Complex

Von Braun III Complex

Location: Redstone Arsenal, Alabama Size: 839,873 SF Cost: $193,000,000 Description: Von Braun III Complex is a six-story headquarters building with 2,120 parking spaces that is part of an existing office park and research campus for the US Missile Defense Agency (MDA). To date, Von Braun Complex III is the largest single building on Redstone Arsenal. [...]
Applied Instruction Facility EOD Course

Applied Instruction Facility EOD Course

Location: Eglin Air Force Base, Florida Size: 50,506 SF Cost: $16,251,600 Description: This project included the construction of two new buildings, the expansion of the existing dining facility and extensive water and sanitary sewer upgrades. The water improvements included over two miles of new 16” water main and a new six-pump booster station to provide [...]
Volvo North American Manufacturing Center

Volvo North American Manufacturing Center

Size: 1,700,000 SF, 1600 acres Cost: $500,000,000 Description: The Volvo North American Manufacturing Center will produce 100,000 cars a year. Volvo’s site includes six main buildings that total 1.7 million square-feet. The site design includes 1500 employee parking spaces with planned expansions and a campus-wide utility distribution network. A two-mile long vehicle test track loop [...]
Return to top of page