CHS Taxiways Repair

CHS Taxiways Repair

Location: Charleston International Airport, North Charleston, South Carolina Size: 4,045 LF Cost: $23,000,000 ($1,000,000 under budget) Description: Taxiway Alpha, Taxiway Bravo were completely reconstructed and Taxiway Golf was improved at Charleston International Airport. Services Aviation EngineeringBidding and Negotiation CoordinationConstruction Document PreparationCost Estimating and ControlErosion and Sediment ControlFAA Review of Construction Plans & SpecificationFederal and Military [...]
JBC Runway 15/33

JBC Runway 15/33

Location: Joint Base Charleston, North Charleston, South Carolina Size: 9001 feet long x 150 feet wide Cost: $40,200,000 ($8,800,000 under budget) Description: The Runway 15-33 restoration project involved the complete removal and reconstruction of the existing 9001 feet primary runway at Joint Base Charleston. The existing runway pavement was over 50 years old and had [...]
North Air Force Auxiliary Airfield C-17 Landing Zone Repair

North Air Force Auxiliary Airfield C-17 Landing Zone Repair

Location: North Air Force Auxiliary Airfield, North Charleston, South Carolina Size: 3,500 feet x 90 feet wide Cost: $8,000,000 Description: The original landing zone was constructed of asphalt for the purpose of training C-17 pilots to land in remote theaters of operation. Having exceeded its design life, it was time to reconstruct the runway. The [...]
Pope Army Airfield Repair Failed Airfield Pavement

Pope Army Airfield Repair Failed Airfield Pavement

Location: Fort Bragg, North Carolina Size: 160,000 SY Cost: $25,800,000 Description: The reconstruction of approximately 160,000 SY of apron pavement included a subdrainage system, grading and drainage, construction safety and phasing, as well as the analysis and master planning of the existing storm drainage system for a 54 acre contributory area. Also included was master [...]