Skip links

Archive

Clemson University Renovation Feasibility Study

Clemson University Renovation Feasibility Study

Location: Clemson, South Carolina Description: ADC worked with Clemson University Facilities, Parking Services and Athletic departments to master plan improvements to the existing parking lots adjacent to Memorial Stadium. The goal of the project was to increase available parking, increase open space that could be used by students and football fans and improve vehicular and [...]
Von Braun III Complex

Von Braun III Complex

Location: Redstone Arsenal, Alabama Size: 839,873 SF Cost: $193,000,000 Description: Von Braun III Complex is a six-story headquarters building with 2,120 parking spaces that is part of an existing office park and research campus for the US Missile Defense Agency (MDA). To date, Von Braun Complex III is the largest single building on Redstone Arsenal. [...]
Blickle

Blickle

Size: 57,750 SF, 25 acres Cost: $6,000,000 Description: The construction of Blickle USA’s distribution center includes a new master stormwater pond, parking and truck maneuvering area. The project included master planning for three future phases totaling an additional 125,000 square feet of distribution space. ADC completed a detailed grading analysis to balance the site and [...]
Volvo North American Manufacturing Center

Volvo North American Manufacturing Center

Size: 1,700,000 SF, 1600 acres Cost: $500,000,000 Description: The Volvo North American Manufacturing Center will produce 100,000 cars a year. Volvo’s site includes six main buildings that total 1.7 million square-feet. The site design includes 1500 employee parking spaces with planned expansions and a campus-wide utility distribution network. A two-mile long vehicle test track loop [...]
Pope Army Airfield Repair Failed Airfield Pavement

Pope Army Airfield Repair Failed Airfield Pavement

Location: Fort Bragg, North Carolina Size: 160,000 SY Cost: $25,800,000 Description: The reconstruction of approximately 160,000 SY of apron pavement included a subdrainage system, grading and drainage, construction safety and phasing, as well as the analysis and master planning of the existing storm drainage system for a 54 acre contributory area. Also included was master [...]
Return to top of page