Skip links

Archive

Pope Army Airfield Repair Failed Airfield Pavement

Pope Army Airfield Repair Failed Airfield Pavement

Location: Fort Bragg, North Carolina Size: 160,000 SY Cost: $25,800,000 Description: The reconstruction of approximately 160,000 SY of apron pavement included a subdrainage system, grading and drainage, construction safety and phasing, as well as the analysis and master planning of the existing storm drainage system for a 54 acre contributory area. Also included was master [...]
Return to top of page